Two condo projects in Portland are taking buyers this fall, and their prices are about $2 million apart. At 246 Eastern Promenade, construction is underway on a 13-unit building. Its sales site lists the units still available from $2,276,000 to $3,395,000, and seven of the 13 floor plans are marked under contract. About four miles west, off outer Congress Street, GreenMars is building Stroudwater Commons. Its market-rate one-bedroom condos start at $335,000, and its income-qualified one-bedrooms start at $241,000.
That gap shows where new housing is going in Portland right now. On the peninsula, new condos are being priced from about $1 million into the $3 millions, and most new rentals are income-restricted. New for-sale homes in the $300,000s and $400,000s are being built off the peninsula. A buyer with a middle-market budget who is comparing Munjoy Hill, the West End and Deering is really choosing between a new home off the peninsula and an older home on it.
The peninsula's new condos start near $1 million and run past $3 million
The Eastern Prom building is the clearest example. Every unit has a deck or patio, covered parking and a climate-controlled storage unit, and buyers pick their own fixtures and finishes. Those features are part of what the prices pay for.
In the West End, the next new condo building is planned for 64 Pine Street. Its sales site advertises 12 three-bedroom condos called Aurora, priced from $1.695 million to $2.395 million. The site lists a fall 2026 construction start and move-in in spring or summer 2028. The project was first designed with nine units. In 2025 Mainebiz reported that it was on hold, because adding units to cover rising construction costs would also have added $548,490 in city housing fees. The developer called that "a non-starter." A few blocks away, Carleton West at 53 Carleton Street broke ground in 2024 as nine townhouses and condos. Prices ran from just under $1 million for the smallest condo to more than $2 million for the townhouses.
On the waterfront, the Bangor Daily News found an asking price of nearly $2.9 million in October 2025 for a condo at Hobson's Landing, 387 Commercial Street, which was built in 2024. Down the street, an approved five-story building at 185 Commercial Street was put on hold in 2025. Mainebiz reported that economic factors and a slowing condo market on the peninsula were among the reasons.
These projects have something in common. For a new peninsula condo to cover today's land and construction costs, it has to sell at a price only the top of the market pays. The projects aimed at that buyer are the ones getting built. The more modest ones are waiting.
Munjoy Hill and the eastern waterfront are adding rentals, with more condos planned
At the foot of Munjoy Hill, where Washington Avenue meets the ramp to I-295, Penobscot General Contractors spent this summer clearing the former Northern Burner Supply building. The site is for Tavata, a 325-unit, seven-story apartment building by Redfern Properties. The Planning Board approved it in February 2025, and it then sat on hold. Site work began this June. Jonathan Culley of Redfern told Mainebiz that "Our target rents per person average below 70% AMI," and called it potentially "the largest contribution of housing priced for middle-income workers in the city's history."
So the East End's largest new middle-income project is a rental. The same is true a few blocks up the hill. GreenMars has approval for an 87-unit, seven-story apartment building on an empty lot at 221 Congress Street. Chris Marshall, a GreenMars principal, told Mainebiz in June that "we are unlikely to start soon, as we cannot do anything until IZ is modified, or unless there are subsidies."
The largest number of planned condos is at Portland Foreside, the 10-acre former Portland Company site on Fore Street. As of this spring, the plans included 132 condos at Channel Mark, 39 condo units inside The Promenade hotel, 17 townhomes and a 186-unit apartment building called Harbor Hill, according to The Bollard. The Portland Press Herald reported in March that the project's projected cost had risen above $1 billion. The Bollard reported on November 8 that construction had not resumed. If you are weighing the East End, plan around the Foreside condos as a future possibility, not a supply of homes you can count on this year.
Bayside is adding the most new homes, and nearly all of them are rentals
More residential construction is underway in Bayside than in any other peninsula neighborhood, and it is almost entirely rental housing. The Bellwether, at 89 Elm Street in West Bayside, is a 201-unit, $88 million building by Avesta Housing and Reveler Development. It topped off in August, and it is expected to open in summer 2027. Mainebiz reported projected rents of $1,270 for studios and $1,630 for two-bedroom apartments. Equality Commons, 54 income-restricted apartments for older adults at 25 Casco Street, opened on August 19. Two more are planned. One is Youth & Family Outreach's 60 mixed-income apartments with child care at 337 Cumberland Avenue. The other is The Prime, an Avesta and Reveler building at 197 Oxford Street.
The longer-range Bayside master development plan calls for more than 800 rental homes in five phases over about ten years, with more than 600 of them at market rate. For a buyer, Bayside's new construction will bring more neighbors and more foot traffic. It will not add many homes for sale.
New homes in the $300,000s and $400,000s are off the peninsula
The new for-sale homes at middle-market prices are on the city's western edge. Stroudwater Commons, off outer Congress Street, has 130 one-, two- and three-bedroom condos and 26 studio accessory dwelling units. Mainebiz reported in January that half the condos are set aside for buyers earning 80 to 100 percent of area median income. Market-rate three-bedrooms ran up to $449,999 when the Portland Press Herald covered the project in May. In that article, Marshall said the project shows that new homes can be priced so first-time buyers start building equity right away. The first homes are expected to be ready in summer 2027.
In Libbytown, near Dougherty Field, a set of 20 all-electric modular condos on Douglass Street opened in late 2025. WGME reported prices starting at $268,000 for one bedroom and $325,000 for three, for buyers earning up to Portland's median income. The development partners' timeline showed 19 of the 20 sold and one under contract as of November 2025.
Both projects show that there are buyers for new construction at these prices, and both were built off the peninsula. Of the new for-sale projects covered here, the ones priced well under $500,000 are on outer Congress Street and near Dougherty Field, and none of the projects on Munjoy Hill or in the West End is priced in that range.
On the peninsula, a middle-market budget buys an older home
On the peninsula, the middle of the market is the homes that are already built. In 2025, Portland had 295 condo sales, down from 371 in 2024, and the average condo price fell 9.6 percent to $666,550, according to a year-end sales report in Mainebiz. Condos averaged 58 days on the market in 2025, compared with 28 days for single-family homes. The broker behind that report said condo buyers were responding to value and rewarding sellers who priced correctly from the start.
The most recent county numbers show a market adjusting slowly, without a sharp drop. From August 1 through October 31, 2026, Cumberland County recorded 980 single-family sales at a median price of $600,000. Sales were down 4.67 percent and the median was down 1.40 percent from the same three months a year earlier, according to Maine Listings' November 12 release. With few new middle-market homes coming on the peninsula, the older condos, converted triple-deckers and single-family homes there have little new construction to compete with. Their condition, layout and upkeep set their value more than new supply does.
That changes what a buyer checks before writing an offer. A new condo at Stroudwater Commons comes with new mechanicals and finishes chosen at the start. A condo in an older building on Munjoy Hill, a short walk from the Eastern Prom, comes with that building's age, and its next roof, heating system and window replacement are part of the cost of owning it.
Approved projects take years to become homes buyers can see
Several developers in this post named the same cost when they explained their delays. Mainebiz reported in June that Portland's inclusionary zoning fee was more than $186,000 per unit, and Marshall told the outlet, "The IZ fee has now cost us six seasons of construction, where market rate housing has not been built." City councilors have been reviewing the fee in committee this fall.
In 2025, the city approved more than 1,300 homes but completed 159, the Bangor Daily News reported in January. A buyer choosing a Portland neighborhood this winter should judge it by what is already standing and what is actually under construction.
Questions from buyers comparing Portland neighborhoods
Is there new construction on the peninsula for under $1 million? Among the projects above, the new for-sale homes on the peninsula start near $1 million at Carleton West and run past $3 million on the Eastern Prom. The new projects priced in the $200,000s to $400,000s are at Stroudwater Commons and on Douglass Street.
Which peninsula neighborhood is adding the most homes? Bayside, with The Bellwether, Equality Commons and several more buildings planned. Nearly all of them are rentals.
Will Portland Foreside add condos to the East End? The plans include 171 condos between Channel Mark and The Promenade. As of The Bollard's November 8 report, construction had not resumed.
At Bedard Realty, we look at a Portland home the way a builder does. Before you choose between a new condo off the peninsula and an older home near the Eastern Prom, we can walk both with you and go over the building, the systems and the long-term costs. When a resale home isn't the right fit, we can talk through a custom home instead. Start with our Portland neighborhood guide, then request a consultation.